suoLL Logo
  • about
    • suoLL
    • Caroline Lobo
    • contact us
  • portfolio
    • prior to suoLL experience
    • arcadia high school
    • Chaparral High School
    • EMCC Mariposa Hall
    • GCU Classroom Building
    • GCU College of Arts & Science
    • GCU Fleming Library Repurpose
    • GCU North Gym Lecture Halls
    • Julian Elementary School
    • Papago Elementary School
    • Red Rock High School PAC
    • Reproductive Medical Institute
    • Sedona Unified District Office
    • Verrado High School
    • West Sedona Elementary School
    • Higher Education
    • Basketball Practice Facility
    • canyon activity center
    • gcu baseball stadium 
    • Interdisciplinary Engineering I
    • Interdisciplinary Engineering II
    • Soccer Stadium
    • Student Life
    • student recreation center expansion
    • Community
    • 32 E Foothill Residence
    • Office Center
    • Student Housing (Apartments)
    • Student Housing (Dormitories)
    • Healthcare (Under Construction)

gcu baseball stadium 

3000 stadium seats |  concessions | retail | training facilities | production booth | athletic academic support

2 story | 4500 seats | phoenix | 2018 

challenged with the constraint of retaining the existing baseball field and practice field, this major renovation project embraces the existing field with stadium seating creating an intimate spectator experience.  sited along the edge of the campus, the stadium is ‘transparent’ and ‘airy’, providing spectators a range of game day social experiences. the stadium envelope wrapped with an alternating perforated metal screen provides shade and visual relief. the stadium’s upper level concourse is a multi-functional student | spectator space with unbelievable views to spectacular arizona sunsets.  in 2018 the stadium received ‘best ballpark improvement’ award.

project info