Performing Arts
Center Addition | Gymnasium | Classroom | Music Studio | Band Studio | Scene
shop
1 story | 44,000 SF | $13.5M | Sedona |2010 | LEED-NC Gold (Registered)
Part of the school
bond passed by the Sedona community was to update the 250 seat performing arts
center on Red Rock High School campus with a 750 seat house and updated lobby,
stage and back of house spaces to meet the needs of the school and City of
Sedona community. The lobby design was to not only capture the surrounding
beauty from the lobby but to create an illuminated beacon for the community at
night. Visitors are taken through an art
walk experience where they meander past artwork of local artists. This way-finding experience becomes part of
the overall performance experience. The
house and stage are designed for variable acoustics, which can be tuned for
either music or drama productions. Total project design consideration was to
tie into the fabric of the existing campus.
Project completed while at Orcutt | Winslow.